During 2011 Reading railway station was redeveloped and MyZone played a vital role in the overall rail safety and site safety planning. Confident of our technology's performance and reliability, the Network Rail team were keen to reinforce the Network Rail life-saving rules. By deploying our system throughout their flagship project, the team specifically targeted the exclusion zone rule, ratifying the Network Rail mantra of 'Everyone Home Safe Every Day'

At the time, Rob Mashford was the Project Manager for Network Rail who provided the following overview of our systems performance:

"The Reading project has since 2011 used the MyZone Worker Alert System to exceptional effect by adding it as part of the mandatory Personal Protection Equipment (PPE) issue. It has provided an essential personal alert to everybody on site, including visitors, thereby increasing everybody's safety awareness and highlighting the continual workforce engagement that emphasises our sites awareness of the dangers associated with working alongside moving plant. As part of the overall strategy for providing a safe working environment for all, the site management have no doubt in confirming that the use of MyZone on the Reading project has played a vital and essential role in helping the management team plan safe systems of working across this flagship project."

Back to case studies
connect